Sub Station Electrics

We were tasked with the installation of a new main switch, originating from a newly constructed substation, and connecting it to a 185mm SWA (Steel Wire Armoured) cable joint.

This installation aimed to facilitate power supply to a fast food restaurant. The project spanned four days, during which we ensured the continuous operation of the restaurant by providing a generator while the existing substation was demolished. Through seamless collaboration with Scottish Power, we successfully executed the transition, enabling the fast food restaurant to maintain uninterrupted service during the switchover process.